PCM Procurement Schedule

Using the fast-food franchise scenario we used in project assignments 1-4, assume a different
role: that of the project owner (the fast-food franchisee) who is setting out to hire a professional
construction manager (PCM) to manage the project. In preparing to hire the PCM, perform the
following:
1. List the qualifications required of the PCM for consideration.
2. List the information that you will include in the request for proposal package
(consultant bid package).
3. List the information that all PCM proposals must contain to be considered
(proposal submittal requirements).
4. List the duties and responsibilities that you will require of your PCM.
5. Prepare a detailed PCM procurement schedule.
6. Prepare a scoring matrix (rubric) to analyze and evaluate the prospective PCM
who submit proposals for your project.

Leave a Reply